Haulage Onitsha – Awka, Anambra
[Sample] Dedicated tipper fleet for a 38 km road contract
Twelve tippers and drivers assigned full-time to move laterite, sand and granite for a federal road dualisation contractor.
Ongoing, 2026
Port collection, permits, escort and delivery of a 14-inch cutter-suction dredger in six abnormal loads.
Scope of work to be supplied by the division head.
Describe the problem the client faced: site conditions, deadline, access, regulatory or environmental constraints.
Describe how we solved it: plant and people deployed, method, how risks were managed.
Measurable outcomes: quantities delivered, time saved, safety record, client feedback.
Haulage Onitsha – Awka, Anambra
Twelve tippers and drivers assigned full-time to move laterite, sand and granite for a federal road dualisation contractor.
Ongoing, 2026