Haulage Onne port to Lokoja, Kogi
[Sample] Low-loader movement of a dismantled dredger, Onne to Lokoja
Port collection, permits, escort and delivery of a 14-inch cutter-suction dredger in six abnormal loads.
Completed, 2025
Twelve tippers and drivers assigned full-time to move laterite, sand and granite for a federal road dualisation contractor.
Scope of work to be supplied by the division head.
Describe the problem the client faced: site conditions, deadline, access, regulatory or environmental constraints.
Describe how we solved it: plant and people deployed, method, how risks were managed.
Measurable outcomes: quantities delivered, time saved, safety record, client feedback.
Haulage Onne port to Lokoja, Kogi
Port collection, permits, escort and delivery of a 14-inch cutter-suction dredger in six abnormal loads.
Completed, 2025